Sunday, May 4, 2014

Remodelling done!

The remodelling was finished on Friday.  It took the plumber longer than he expected to be able to connect the lines to the sink without leakage.  But finally, it was done.  He gave me his number in case there was still a leak.

My bad, I did not plan for towel racks.  I checked with the contractor and he said to get some and let him know so he could send someone out to install them.  The worker at the house said just to call him directly.

By Friday, Sake and Haiku were basically okay with the workmen coming and going, They would slink around and check with me, but also come and go as they wanted.  Taki was still not sure.  She did growl in the morning at traffic, and when the workmen arrived.  But, when they were not making noise, she would come out and check it out, but scamper away the minute they made some noise.

I am satisfied with the results, and glad this is over with.  The contractor said if he could get by Saturday, he would, so I could pay him, otherwise, I should mail the check with the agreed upon adjusted amount.

When I contracted to have windows installed in 2007, it was a horrible experience, and it only lasted two days. I regretted using the contractors I used.  This was a week long experience and it was fine. What a difference using a business that is professional and well versed in what they know to do.

No comments:

Post a Comment