I am having a bathroom remodelled by Gil Construction http://www.gillconfamily.com/. Last week, when I called the owner to say I wanted to use their services, I told him I could not start the next day as he offered. I got coverage for work, and called him and told him that. He said he could start Monday, but was unsure about all of the timing, and asked if my being off work would cost me. I assured him I had paid leave. I thought that was a very considerate question.
The remodelling started today. I have arranged to take off from work this week to get this done. The first step was to get the players together so I knew who they were, and so they knew what they needed today. They started dissembling the bathroom, and conferring on the game plan.
The remodellers are so nice. I have 3 cats, and explained that we need to keep the doors closed as one is an escape artist. They have payed close attention to that. They have given me good information about time frames. The owner of the business noticed that my shower leaks, and said he would give me an estimate to fix that.
They leave all doors as I have them: opened or closed. They clean up after themselves with no trace of presence.
Sake kept coming out and around, wanting to be held, checking me out, checking things out but not wanting to visit with the strangers.
Haiku visited briefly, and the workers took the time to visit her, then she vacated herself.
Taki hid. She would come out to the living room, hide under the futon, raced back to computer room or the spare bedroom, then slink back out again.
With fair warning, they ran the shop vac. All three girls were in the computer room, so I closed the door.
This is a work in progress.
You will get updates as we go along.
No comments:
Post a Comment